Cost Codes
Cost Codes is where you sort every construction expense by type, phase or scope in Sledge.
Cost Codes
| Code | Name | Division | Budget | Spent | Remaining | Status |
|---|---|---|---|---|---|---|
| 03 30 00 | Cast-in-Place Concrete | 03 Concrete | $1,240,000 | $812,400 | $427,600 | |
| 05 12 00 | Structural Steel | 05 Metals | $948,000 | $1,021,300 | −$73,300 | |
| 06 10 00 | Rough Carpentry | 06 Wood | $612,000 | $518,900 | $93,100 | |
| 09 29 00 | Gypsum Board | 09 Finishes | $384,000 | $142,700 | $241,300 | |
| 26 00 00 | Electrical | 26 Electrical | $722,000 | $406,100 | $315,900 | |
| 01 50 00 | Temporary Facilities | 01 General | $166,000 | $121,800 | $44,200 |

Sledge AI
Or just ask Sledge.
Tell Sledge what you need by voice or text and it creates, updates or sends the record for you.
I added 48 14 00 Solar Energy Electrical Power Generating Equipment under Division 48 and gave it a $286,000 budget on Georgetown Logistics Center from the bid. New bills for the panels will code there.
48 14 00 · Solar Energy EquipmentCreated by Sledge · open in canvasNEW
I added 48 14 00 Solar Energy Electrical Power Generating Equipment under Division 48 and gave it a $286,000 budget on Georgetown Logistics Center from the bid. New bills for the panels will code there.
48 14 00 · Solar Energy EquipmentCreated by Sledge · open in canvasNEW
What you can do with Cost Codes
Categorize every cost
Sort expenses by type, phase or scope.
Match your jobs
Set up codes the way your jobs actually run.
Report cleanly
See where money goes without manual sorting.
Same structure everywhere
Use one set across bills, budgets and invoices.
How to use Cost Codes
- 01
Define
Set up categories for labor, materials and more.
Cost Codes
Add1 monthCodes86CSI MasterFormat1 monthDivisions16in use1 monthCoded spend$5.4Mauto-coded by Sledge1 monthOver budget1code over1 monthSearch codes by number or nameCode Name Division Budget Spent Remaining Status 03 30 00 Cast-in-Place Concrete 03 Concrete $1,240,000 $812,400 $427,600 05 12 00 Structural Steel 05 Metals $948,000 $1,021,300 −$73,300 06 10 00 Rough Carpentry 06 Wood $612,000 $518,900 $93,100 09 29 00 Gypsum Board 09 Finishes $384,000 $142,700 $241,300 26 00 00 Electrical 26 Electrical $722,000 $406,100 $315,900 01 50 00 Temporary Facilities 01 General $166,000 $121,800 $44,200 
- 02
Apply
Tag bills and invoices the same way.
Cost Codes
Add1 monthCodes86CSI MasterFormat1 monthDivisions16in use1 monthCoded spend$5.4Mauto-coded by Sledge1 monthOver budget1code over1 monthSearch codes by number or name03 30 00$427,600Cast-in-Place ConcreteSpent $812,400 of $1,240,000Remaining$427,60005 12 00−$73,300Structural SteelSpent $1,021,300 of $948,000Remaining−$73,30006 10 00$93,100Rough CarpentrySpent $518,900 of $612,000Remaining$93,10009 29 00$241,300Gypsum BoardSpent $142,700 of $384,000Remaining$241,30026 00 00$315,900ElectricalSpent $406,100 of $722,000Remaining$315,90001 50 00$44,200Temporary FacilitiesSpent $121,800 of $166,000Remaining$44,200
05 12 00 · Structural Steel
ACME BUILDSPrepared with SledgeCOST CODENo. 05 12 00Date Nov 23, 2026Code- Name:
- Structural Steel
- Division:
- 05 Metals
- Type:
- Subcontract and material
By project- Riverside Medical Office:
- $709,400 of $700,000
- Eastside Fire Station 9:
- $311,900 of $248,000
Totals- Budget:
- $948,000
- Spent:
- $1,021,300
- Over:
- $73,300
Hold to talk
- 03
Track
Watch spend by category as work happens.
Cost Codes
Add1 monthCodes86CSI MasterFormat1 monthDivisions16in use1 monthCoded spend$5.4Mauto-coded by Sledge1 monthOver budget1code over1 monthSearch codes by number or nameCode Name Division Budget Spent Remaining Status 03 30 00 Cast-in-Place Concrete 03 Concrete $1,240,000 $812,400 $427,600 05 12 00 Structural Steel 05 Metals $948,000 $1,021,300 −$73,300 06 10 00 Rough Carpentry 06 Wood $612,000 $518,900 $93,100 09 29 00 Gypsum Board 09 Finishes $384,000 $142,700 $241,300 26 00 00 Electrical 26 Electrical $722,000 $406,100 $315,900 01 50 00 Temporary Facilities 01 General $166,000 $121,800 $44,200 
- 04
Report
Break down financials without extra work.
Cost Codes
Add1 monthCodes86CSI MasterFormat1 monthDivisions16in use1 monthCoded spend$5.4Mauto-coded by Sledge1 monthOver budget1code over1 monthSearch codes by number or nameCode Name Division Budget Spent Remaining Status 03 30 00 Cast-in-Place Concrete 03 Concrete $1,240,000 $812,400 $427,600 05 12 00 Structural Steel 05 Metals $948,000 $1,021,300 −$73,300 06 10 00 Rough Carpentry 06 Wood $612,000 $518,900 $93,100 09 29 00 Gypsum Board 09 Finishes $384,000 $142,700 $241,300 26 00 00 Electrical 26 Electrical $722,000 $406,100 $315,900 01 50 00 Temporary Facilities 01 General $166,000 $121,800 $44,200 


What connects to Cost Codes
- Bills & InvoicesUsed across bills and invoices.
- BudgetingPowers budgeting and cost tracking.
- ProjectsConnected to projects for full visibility.
- AccountingSyncs with accounting for consistency.
Questions about Cost Codes
Cost codes are categories for expenses, such as labor and materials, so every dollar on a job is accounted for.
What builders are saying
“I was juggling QuickBooks, a separate AP tool, and three different spreadsheets just to run a job. Sledge pulled it into one place for invoices, waivers, and costs, and the matching alone saves me hours a week.”
“Lien waivers were always the thing I dropped. Sledge tracks every waiver, flags what’s missing, and files it, so I’m covered before I ever get to draw.”
“It reads the bill, codes it to the right job, routes it for approval, and pays it. That’s a whole role I didn’t have to hire for.”
More in Financials
AccountingThe money on every project in one view.
Lien WaiversCollect, check and file every waiver before you pay.