Track Every Bid Version: Budget, Schematic, CDs, and Hard Bid

Why a bid log beats a 'Sent' folder.

By Raz Danoukh • Nov 19, 2026 • 5 minute read

Hands sorting multiple sets of construction drawings marked with colored tabs on a desk next to a laptop.
Hands sorting multiple sets of construction drawings marked with colored tabs on a desk next to a laptop.

A bid log records every version of a bid you send: which phase it priced (budget, schematic, CD set, or hard bid), which drawings it was based on, which GC received it, when, and for how much. With that record, you can always tell what changed and what you're committed to.

One project, half a dozen prices. A budget number when the owner was still deciding whether to build. A schematic number as the design took shape, and often another at design development. Two or three updates as the construction documents developed. Then the hard bid. Send each to several GCs and you have a lot of numbers in circulation. A construction bid log is how you keep track of every bid version, so when a GC asks whether your number still holds, you know which number they mean.

Why projects get priced over and over

Owners and GCs need cost feedback as the design develops. Budget pricing tells them whether the project is feasible. Schematic and design development pricing keeps the design on budget. Pricing at each CD milestone catches cost drift. The hard bid sets the contract. Every round is a chance to win the work, but also a chance to lose track of what you said.

What a bid log should capture

For every version: the phase, the drawing set and addenda it was based on, the date sent, the recipient GC and contact, the amount, the qualifications and exclusions, and the expiration date. Keep the actual proposal document attached to the entry. A log entry without the document is just a rumor.

Why a 'Sent' folder isn't enough

A folder of sent proposals tells you what went out. It doesn't tell you what replaced what, which drawings a number was based on, or which GC is holding an outdated version. File names like FINAL_v3_revised don't help. A log puts the versions in order, ties each one to its phase, and makes the current number obvious.

Sending to multiple GCs

Subs routinely bid the same project to several GCs, and the versions don't always match. One GC asked for an alternate. Another got your number before an addendum. A third negotiated a scope change. The log should show, for each GC, exactly what they have. That way, when one of them is awarded the project, you know which number you're committed to.

Comparing versions quickly

When the number moves between versions, someone will ask why. You should be able to switch between versions and see exactly what changed: quantities from a drawing revision, pricing updates, scope added or removed. If you can explain a change clearly, the GC trusts your number. If you can't, they question all of it.

Using the log to bid smarter

Over time, the log becomes market intelligence. Which GCs keep asking for budget numbers and never award? At what phase do you usually win? How far does your number move from budget to hard bid? These patterns help you decide where to spend estimating time.

How to set up a construction bid log

You can start with a simple table today. The columns that matter:

  • Project and version number (v1, v2, v3…)
  • Phase: budget, schematic design, design development, CD set, or hard bid
  • Drawing set date and addenda acknowledged
  • Recipient GC, contact, and date sent
  • Base amount, alternates, and expiration date
  • What changed from the prior version, in one sentence
  • Outcome: pending, awarded, lost, or no decision

Understanding design phases

Design phase names (schematic design, design development, and construction documents) follow the standard sequence used in owner-architect agreements, like those published by AIA Contract Documents. Budget pricing comes before schematic design, and the hard bid follows once the documents are complete. Organizing each version's scope by CSI MasterFormat section or line item makes version-to-version comparisons much faster.

Connect the log to the rest of preconstruction

The log works best alongside a consistent bid/no-bid decision and a proposal format GCs can level. And if version updates are scattered across inboxes, see how contractors beat construction email overload.

For broader preconstruction and bidding education, the Associated General Contractors of America offers resources on how GCs run their own bid processes, useful context when you're deciding how much detail to track.

Worked example: one project, five bid versions

Here's how a log might read for a single mid-size project (amounts illustrative):

  • v1, budget, conceptual sketches, sent to GC A: $1.10M. Assumed standard finishes and a single phase.
  • v2, schematic, SD set, sent to GC A: $1.18M. Added a mezzanine shown in the new set.
  • v3, 50% CDs, sent to GC A and GC B: $1.24M. Quantities from the first real takeoff.
  • v4, 90% CDs, sent to GC A, B, and C: $1.21M. Value engineering removed one finish upgrade.
  • v5, hard bid, 100% CDs plus addenda 1–2, sent to GC B and C only: $1.23M. Addendum 2 added fire-rated assemblies.

Now, when GC A is awarded the project and calls asking you to honor "your number," you can see they never received the hard bid. Their last version was v4 at $1.21M, before addendum 2 added the fire-rated assemblies. That one line in the log turns a tense phone call into a quick, factual answer.

Rules that keep the log trustworthy

  • Never edit a sent version. Create a new one.
  • Log the version the moment it's sent, not at the end of the week.
  • Attach the exact PDF that went out.
  • Record verbal price changes as new versions, then confirm them in writing.

Bid log mistakes to avoid

The most common bid log failure is the log that's always a week behind. If entries get added on Friday from memory, the details that matter, like which addenda were acknowledged and which GC got which alternate, are the first to go. Log at the moment of sending. The second failure is logging totals without scope. A number with no qualifications attached can't settle a dispute, because the dispute is almost always about what the number included. Attach the PDF and summarize key exclusions in the entry itself.

The third is treating verbal numbers as off the record. A price given on the phone on bid day is still a price the GC may carry. Log it as a version, then send a short email confirming it with the same scope basis. Finally, don't let the log stop at award. When you win, mark the awarded version clearly and hand it to the project manager with the estimate, so the team building the job knows exactly what was sold. When you lose, note the reason if the GC shares it. Over a year, those notes tell you more about your pricing than any market report.

FAQ

What's the difference between a bid log and a bid tracker?

A bid tracker usually lists opportunities and due dates. A bid log goes deeper, recording every version you sent, to whom, based on which drawings, and what changed.

Should budget numbers be in the same log as hard bids?

Yes. Seeing the full progression from budget to hard bid shows how your number moved and helps you spot GCs who ask for budgets but rarely award.

How should I handle addenda in the log?

List the addenda each version acknowledges. If an addendum changes your price, log a new version rather than editing the old one.

Who should own the bid log?

The estimator who sends the number. One owner per project keeps entries consistent, and a shared view lets project managers see what was promised once the job is awarded.

Can a spreadsheet work as a bid log?

Yes, to start. The limits show up when several estimators edit the same file, PDFs live somewhere else, and the log isn't connected to the estimate. That's when a purpose-built log saves real time.

How long should I keep old versions?

At least through closeout and the warranty period, and ideally for as long as claims can still be brought under your state's statute of limitations. Scope and defect disputes can surface years after the job is done, and they often go back to what was in the bid. Confirm your retention policy with your attorney or accountant.

Know exactly what you sent

A bid log turns a pile of sent proposals into a clear history. We're building a bid log into Sledge's Bid Center that tracks every version by phase and recipient, so you can switch between versions in seconds. Join the open beta to see it as it ships.